The process of selecting acceptable premisses for HWH was very long and more than 20 different sites was visited, finally an old restaurant/mini hotel was chosen. A lot of smaller buildings and abandoned tools, material and boats from a small ship repair shop previously existing on the site and a lot of vegetation and building material waste to be removed before a proper and functional Halfway House can be erected on the site

 

Preparation for cleanup of new Half Way House site

ngoFontana.org  / Pictureshttp://www.ngoFontana.org
Return to main sitehttp://www.ngoFontana.org